Negotiable
The date of payment from buyers deliver within days
Zhejiang
Long-term effective
2024-02-11 16:52
304
welding(Mr.)
Zhejiang
No.28 Wenzhong Road, Zhuji City, Zhejiang, China
Â
Â
Â
Â
Welding Requirements
a) The pipes to be welded must have physical/chemical characteristics which allow them to be fusing. This data must be provided and certificated by your pipe suppliers. Both pipes to be joined must have the same outside diameter and wall thickness.
b) The following conditions must exist:
In muddy, dirty, strong wind or low temperature environments, please use a tent for protection.
A tent should also be used for high ambient temperature areas.
For cold area, increase heater plate temperatures up to 20 degrees C above normal.
The pipe ends to be welded must be clean.
The pipe ends to be welded must have same temperature ( Avoid strong sunlight).
During welding (especially during cool down), avoid any collision or stress to the weld.
The open ends of pipes to be welded must be covered to avoid wind blowing into pipes.
Place the pipes on pipe supports to reduce drag.
Â
Â
Â
Â
Q: Why choose our company?
Q: How about your after-sale service?
Â
Â
Â
Â
Â
Â
Â
Â
Â
http://www.huajinwelder.com/